Ýzmit Road improvement

Colbonddrain wickdrain for Soil Consolidation

t1 t2

 

 

Colbonddrain successfully used for the road consolidation. The water in the clay soil drained . Wickdrain installed upto 18 meters depth by means of a rig attached to an excavator. Soil was very weak and soft with low SPT values. But at the top there was a hard section like rock. So, in some sections preliminary drilling had done.

Soil tests performed by Highways directorate. The installation of the band drains was very fast. Soil consolidation reached the design limits earlier.